Although I held this position, we still discussed each shot and result to ensure that they worked for both of us as it is our joint project.
As director, I took charge of ensuring all framing was accurate and all the footage was perfect. Due to our good storyboarding - we were able to film each frame efficiently without any delay as we had them listed all out for us on our shoot list.
We used two locations for this narrative:
- Elsenham Train Station
- Flitch Way (Hatfield Forest) in Takeley
We have done this because we filmed all the scenes with the same characters on the same day to make it easier for us to complete.
No comments:
Post a Comment